The problem addenda create
You're two days into a bid. Piers are counted, footings are traced, slabs are calibrated. Addendum 2 drops. Fourteen sheets are revised, most of them minor detail changes. Historically, you have two bad options: redo the takeoff on the affected sheets (hours), or hope the changes don't affect your quantities (dangerous).
Drawing sets in one paragraph
A drawing set is a named bundle of sheets — "Bid Set," "Addendum 1," "Addendum 2," "For Construction." You assign each uploaded sheet to a set. When you're taking off, you pick which set is active. The measurements are shared across sets on the same base sheet, so switching sets doesn't lose your work.
Overlays vs. patches
Overlay. A whole revised sheet floated on top of the original at reduced opacity. You compare old vs. new visually, catch what changed, and update targeted measurements.
Patch. A cropped region of a revised sheet slipped over the same region of the original. Same visual comparison, but only the piece that changed. You keep the rest of the original visible and undisturbed.
Both support independent scale, transparency, rotation, and lock. The base sheet's own scale never changes — the patch has its own scale chip in the toolbar so you can measure on either surface with the right units.
A workflow that actually saves time
- 1.Upload the addendum PDF and assign the sheets to a new "Addendum 2" set.
- 2.On each affected base sheet, add the revised sheet as an overlay. Turn opacity to 40%.
- 3.Visually scan for red-pen changes: added piers, moved footings, revised details.
- 4.For each real change, either drop a patch to keep it visible or delete the measurements the addendum invalidated and re-take just those.
- 5.Print or export against the set that matches what the GC asked for.
Why this matters more in 2026
GCs are issuing more addenda, closer to bid day, than ever. A bid workflow that treats addenda as a first-class concept — instead of "please re-upload the entire set" — is now a competitive advantage, not a nice-to-have.
See also: The addendum survival guide · 60-second scale check