The 30-second answer
Use ZZ Takeoff if measurement is the job: you need fast cloud takeoff across many unrelated trades, you have Bluebeam or PlanSwift files to open directly, and pricing lives somewhere else (Excel, an accountant, a separate estimating system).
Use Bedrock if the bid is the job: you self-perform a trade, you want quantities to price themselves through assemblies and a cost database, you bid sitework that needs real cut/fill, and you send the proposal yourself.
Both are cloud-native, both support real-time multi-user takeoff, and both apply AI to page naming and scaling. The split is scope: ZZ Takeoff ends at quantities plus an export. Bedrock continues through assemblies, cost database, earthwork volumes, proposal, e-signature, and win/loss history in one project.
Is there a free alternative to ZZ Takeoff?
Not here, and we'd rather say so up front. Bedrock has a 7-day trial (card required, cancel before it ends and you pay nothing). After that, Pro is US$139 a month and Premier is US$249 a month, or ten months' price for a year. Pro includes two office seats; Premier has unlimited seats and adds the job tools, plus Earthwork Pro for earthwork and sitework trades. Prices in Canada, Australia, New Zealand, the UK and Ireland are on the pricing page.
What is free, with no signup: the concrete calculator, the earthwork calculator and the concrete proposal template. They're handy, but they aren't a takeoff tool.
Comparing more tools? See [every Bedrock comparison](/compare).
Overview
ZZ Takeoff and Bedrock both sell cloud-based takeoff and estimating software to construction contractors. They overlap in basic takeoff capability but diverge sharply in scope, target user, and downstream workflow.
- ZZ Takeoff is a horizontal cloud takeoff product with an estimating layer. It supports multiple trades — concrete, drywall, framing, MEP, sitework — through a generic measurement-and-condition data model.
- Bedrock is a vertical product built specifically for self-perform trade contractors — concrete, earthwork, framing, MEP, steel, masonry, roofing, paving & sitework, and drywall & finishes. It bundles takeoff, trade-aware assemblies, estimating, earthwork volume calculation, integrated proposals, CRM, and production-rate history from past jobs in one platform.
This page compares the two on the capabilities most relevant to self-perform trade bid desks.
Takeoff engine
| Capability | ZZ Takeoff | Bedrock |
|---|---|---|
| Cloud-native, no install | Yes | Yes |
| Multi-page PDF support | Yes | Yes |
| Vector overlay on raster PDFs | Limited | Yes |
| Two-point scale calibration | Yes | Yes |
| Per-sheet scale override | Manual | Native |
| Symbol auto-count | Yes | No |
| Polyline, area, linear measurement | Yes | Yes |
| AI sheet naming and numbering | Yes | Yes |
| Realtime multi-user takeoff on same sheet | Yes | Yes |
| 3D takeoff preview | No | Yes |
Both products handle the core digitizing workflow competently, both let a team work the same takeoff at once, and both name sheets with AI. ZZ Takeoff adds AI auto-count; Bedrock adds per-detail scales and the 3D preview that renders concrete elements as solids while the takeoff is in progress.
Assemblies and quantities
ZZ Takeoff uses a generic assembly model: each assembly maps a measurement type (length, area, count, volume) to a list of material and labor lines. Assemblies are flexible and reusable but are not aware of trade-specific behavior.
Bedrock ships trade-aware assemblies tuned per trade. For concrete work, those include:
- Spread and continuous footings (length, width, depth, top/bottom bar, edge bar, mud slab, formwork derived from perimeter)
- Slabs (on grade, on deck, post-tensioned variants, finish productivity)
- Walls (thickness, height, bond beam, openings, two-sided formwork)
- Columns, beams, pier caps, equipment pads
- Curbs and stairs
Changing a parameter on a trade-aware assembly cascades to the dependent quantities. Changing a wall thickness updates concrete CY, rebar tonnage, and formwork SF in the same write.
| Capability | ZZ Takeoff | Bedrock |
|---|---|---|
| Generic assemblies | Yes | Yes |
| Concrete-specific assembly kinds | No | Yes |
| Auto wall-over-footing stacking | No | Yes |
| Openings on wall faces (3D + quantity) | No | Yes |
| Formwork derived from perimeter and height | Manual | Native |
| Excavation linked to concrete element | Manual | Native |
Earthwork
Earthwork is the largest functional gap between the two products.
| Capability | ZZ Takeoff | Bedrock |
|---|---|---|
| Area × uniform depth volume | Yes | Yes |
| Contour digitization from PDF | No | Yes |
| Existing vs proposed surface comparison | No | Yes |
| Cut/fill heatmap | No | Yes |
| Shrink/swell factor application | No | Yes |
| Net import / export and haul distance | No | Yes |
Contractors that bid sitework alongside concrete typically pair ZZ Takeoff with a dedicated earthwork tool such as AGTEK, Trimble, or Carlson. Bedrock includes a native earthwork engine in the same project workspace as the concrete takeoff.
Estimating layer
| Capability | ZZ Takeoff | Bedrock |
|---|---|---|
| Cost database with labor, material, equipment, sub | Yes | Yes |
| CSI cost code mapping | Yes | Yes (with trade-tuned defaults) |
| Per-project unit cost overrides | Yes | Yes |
| Alternates (add / deduct lines) | Manual | Native |
| Saved pricing scenarios you can swap in | Manual | Native |
| Production rates checked against past jobs | Manual | Native |
| Crew-day rollup feeding schedule | No | Yes |
| Production-rate history from finished jobs | No | Yes |
| Labor flagged against past jobs before you submit | No | Yes |
ZZ Takeoff's estimating module is a flexible column grid. Alternates, scenarios, and historical comparisons can be built in it, but the estimator maintains the structure. Bedrock ships those workflows as first-class features.
Proposals and contract output
| Capability | ZZ Takeoff | Bedrock |
|---|---|---|
| Estimate export (PDF, CSV, XLSX) | Yes | Yes |
| Proposal builder (templated scope, inclusions, exclusions) | No (external) | Native |
| Cover page, table of contents, branded layout | External | Native |
| Electronic signature on proposal | No | Yes |
| Public proposal URL (no login required for recipient) | No | Yes |
| Recipient open/view analytics | No | Yes |
| Issued proposal revisions kept | External | Native |
ZZ Takeoff users assemble proposals in Word or a separate proposal tool. Bedrock generates the proposal from the same model as the estimate.
Project management and CRM
| Capability | ZZ Takeoff | Bedrock |
|---|---|---|
| Project list with status | Yes | Yes |
| Bid calendar with due-date reminders | Limited | Native |
| Follow-up tasks tied to bids | No | Native |
| Win/loss tracking with reason codes | No | Native |
| GC and owner relationship records | No | Native |
| Document storage per project | Limited | Native |
| Activity log per project | Limited | Native |
Pricing model
Specific pricing for both products changes over time. As of this writing, ZZ Takeoff publishes per-user subscription pricing on its website. Bedrock pricing is published at /pricing. Buyers should compare current quotes directly.
Target customer
| Dimension | ZZ Takeoff | Bedrock |
|---|---|---|
| Primary buyer | Multi-trade subs, GCs, generalist estimators | Self-perform trade subs (concrete, earthwork, framing, MEP, steel, masonry, roofing, paving, drywall) |
| Trades supported well | Drywall, framing, MEP, finish trades, light concrete | Concrete, earthwork, framing, MEP, steel, masonry, roofing, paving & sitework, drywall & finishes |
| Best fit firm size | 1–50 estimators across trades | 1–50 estimators across one or more self-perform trades |
| Bid cycle assumed | Days to weeks | Days |
Migration notes
Cost items move over through Bedrock's cost database import (CSV or Excel). Assemblies are set up again, usually starting from Bedrock's starter assemblies for your trade. Live takeoff geometry is not imported — active projects are re-takeoff'd in Bedrock's data model. A typical migration timeline runs 2–3 weeks including parallel-bid validation.
Decision framework
Pick ZZ Takeoff when:
- The firm bids more than three unrelated trades and needs one tool for all of them
- Self-perform trade work is less than 30% of annual bid volume
- Proposals are produced in an existing dedicated tool (PandaDoc, DocuSign CLM, Word templates)
- A dedicated earthwork tool is already in place
Pick Bedrock when:
- Self-perform trade work (concrete, earthwork, framing, MEP, steel, masonry, roofing, paving, or drywall) is the primary bid volume
- The firm wants takeoff, estimate, and proposal in one model
- Earthwork volume calculation needs to live in the same workspace as concrete
- Production-rate history from past jobs and alternates are part of bid review
What ZZ Takeoff does better than Bedrock
An honest comparison names the gaps in both directions.
- Legacy file import. ZZ Takeoff imports Bluebeam and PlanSwift takeoffs directly. Bedrock does not; it re-runs takeoff on the same PDFs. If opening years of existing markup files in place is a hard requirement, that's a real point for ZZ Takeoff.
- AI auto-count. ZZ Takeoff counts repeated symbols for you. In Bedrock you click counts yourself.
- Lighter model to learn. ZZ Takeoff's generic conditions model is simple. Bedrock's trade-aware assemblies are more powerful but ask you to think in parameters and formulas.
- Multi-trade neutrality. A firm bidding many unrelated trades with no self-perform focus may not need trade-tuned structure.
The same bid, both ways
Feature tables hide where the hours go. Four common situations:
1. 42,000 SF slab on grade with thickened edges
- ZZ Takeoff: measure slab area, edge lengths, and counts, export to Excel, map each quantity to a cost line by hand, and rebuild the markup structure.
- Bedrock: draw the slab once. The slab assembly derives concrete CY, mesh or rebar, edge form SF, pump, finish labor hours, and waste from the same geometry, priced live against your cost database.
2. Addendum lands at 4pm the day before the bid
- ZZ Takeoff: re-measure the affected areas, re-export, re-key into the pricing sheet, and re-verify the formulas survived.
- Bedrock: overlay the revised sheet, adjust the affected markups, and the estimate, totals, and proposal update from the same model.
3. GC wants a scope-broken proposal, not a number
- ZZ Takeoff: rebuild it in Word or a separate proposal tool and chase a signature by email.
- Bedrock: generate the itemized proposal from the estimate, share a public link, collect the e-signature, and see when the GC opened it.
Total cost of ownership
Compare the stack, not the line item. A takeoff-only tool is rarely the whole spend.
| Line item | ZZ Takeoff stack | Bedrock stack |
|---|---|---|
| Takeoff | ZZ Takeoff subscription | Included |
| Estimating / pricing | Excel or separate estimating system | Included |
| Earthwork volumes | AGTEK / Trimble / Carlson (if you bid sitework) | Included |
| Proposal + e-signature | PandaDoc / DocuSign / Word | Included |
| CRM & bid calendar | Spreadsheet or separate CRM | Included |
| Accounting handoff | Manual re-entry | QuickBooks Online connection |
Published pricing changes for both vendors. Bedrock is priced per workspace (Pro includes 2 office seats, Premier unlimited), not per user. Get current quotes and compare the whole stack, not just the takeoff seat.
Evaluation checklist
Run both tools against the same real plan set. Score these ten items:
- 1.Time from PDF upload to first measured quantity.
- 2.Whether sheet numbers and titles are recognized automatically.
- 3.Whether a scale error on one detail can be corrected without rescaling the sheet.
- 4.Time to turn measured quantities into a priced estimate.
- 5.What happens to the estimate when one assembly parameter changes.
- 6.Whether earthwork cut/fill is defensible against the geotech assumptions.
- 7.Time from final estimate to a client-ready, branded proposal.
- 8.Whether two estimators can work the same set at the same time without collisions.
- 9.What the bid looks like 12 months later when you want to compare it to actuals.
- 10.Total monthly cost of every tool required to complete step 1 through step 9.
The tool that wins usually wins on items 4, 5, and 7 — the handoffs, not the measuring.