Pre-submit footing checklist
Run this list before you submit any foundation bid. The items below are the most common scope misses we see in bid post-mortems.
Quantities
- Spread footings by type (size × depth)
- Continuous footings — full LF including corner bars
- Pier count by diameter and depth
- Grade beams — LF and dowels into piers
- Mat slab — SF, thickness, top mat, bottom mat
- Pile caps — count, size, top mat
- Thickened slab edges where applicable
Rebar
- Top mat each way at correct spacing
- Bottom mat each way at correct spacing
- Pier vertical bars and ties (or spirals)
- Dowels from footings to columns/walls
- Corner bars at every continuous footing change of direction
- Hooks where required by code
- Splice laps included in tonnage
Excavation
- Footing trench excavation
- Spoil disposal (haul-off vs. on-site)
- Over-excavation per geotech
- Select fill if required
- Compaction and proof roll
- Dewatering if water table is shallow
Forms
- Side forms for spread footings
- Continuous footing forms
- Pier forms (if formed, not drilled)
- Stripping and cleaning labor
- Form release agent
Concrete
- Mix design per spec
- Pump truck if access requires
- Cold weather protection
- Hot weather curing
- Cylinder testing coordination
Coordination
- Anchor bolts and embeds delivered to site by trades
- Templates for anchor bolt placement
- Survey for layout
- Inspection coordination
Print this. Tape it to your monitor. Run it before every submission.