The problem with counting piers
Every takeoff tool ships with a "count" tool. Click, click, click — there's your pier count. The problem is that piers aren't interchangeable. An 18" diameter × 8' deep pier with a (6) #6 vertical cage is not the same scope as a 36" diameter × 18' deep pier with a (12) #8 cage and a #4 spiral.
If your takeoff tool can only count, you're going to drop those into a single line and try to remember the difference at pricing time. You won't.
What true-scale means
In Bedrock, the pier tool draws an actual circle on the plan, scaled to the diameter you've set in the assembly. Click once on a pier symbol and the circle snaps to the column gridline at the real diameter — 18" looks like 18", 36" looks like 36".
That isn't a UI flourish. It does three things:
- Visual QA. When you see the pier circle on the plan, you immediately notice if you've grabbed the wrong assembly. A 36" assembly placed on an 18" pier symbol is obvious.
- Scale-aware rebar. Vertical cage count, tie spacing, and concrete CY all derive from the diameter you set in the assembly. Change the assembly, every pier on the sheet recalculates.
- Quantity flows automatically. Each pier is 1 EA. The assembly handles the math: CY per pier × count, lb rebar per pier × count, drilling LF per pier × count.
The assembly is the unit of work
This is the core idea Bedrock is built on. The assembly knows what a pier is — diameter, depth, vertical bars, ties, drilled or formed. The takeoff tool just records where and how many. The two stay linked.
When the addendum changes pier depth from 8' to 10', you don't re-do the takeoff. You change the assembly's depth parameter. Every pier gets the new concrete and rebar quantity. Every cost line updates. Margin reflows.
That is the unit of work concrete contractors should be using. Not a count tool that forgets the geometry the second you click.