Earthwork takeoff from a PDF, step by step

How to get cut and fill from a civil PDF: check the scale, separate existing and proposed contours, get the elevations right, set the limits and subgrade, then check the result before you price it.

Most earthwork bids start the same way: a civil plan set arrives as a PDF, and somewhere in it is a grading sheet with existing contours, proposed contours and spot grades. Here is the order of work that gets a defensible cut and fill out of it, whatever software you use, and how Bedrock's Earthwork Pro does each step.

1. Find the right sheets and check the scale

Use the grading and drainage sheets, not the site plan; the site plan rarely carries proposed contours. Check the scale against a dimension you can measure, not just the title block: a sheet printed to fit loses its scale. A wrong scale changes every area and volume on the job.

In Earthwork Pro you pick the sheets and their scale, and you can check it against a distance you know.

2. Separate existing from proposed

Existing contours are usually dashed or screened back; proposed contours are solid and heavier. The plan's legend says which is which. Getting this wrong swaps the two surfaces, and the cut becomes fill.

Earthwork Pro reads the contour lines from the PDF and Auto identify sorts them into existing and proposed. You look over its work and fix anything it got wrong. Dotted and broken contours are joined back into one line.

3. Get every contour its elevation

This is where most of the time goes. Each contour needs its elevation, which the plan shows as a label every few lines. Read every label, check that neighbouring contours step by the contour interval, and watch for labels drawn as CAD linework instead of text.

Earthwork Pro reads the labels, including stroked CAD lettering, and fills a missing label from the contours either side, flagged for your review. Unlabeled runs can be numbered by dragging a line across them.

4. Add spot grades

Spot grades (FS, FF, TW, TC, TP, ME and others) carry the design where contours don't: pads, curbs, walls and flat paving. Leave them out and the proposed surface sags between contours. Earthwork Pro reads spot grades off the PDF for review.

5. Set the limits and the subgrade

Draw the limit of grading so nothing outside the work counts. Then model what sits below finished grade: building pads, pavement sections, sidewalks and landscape topsoil. Cut and fill to subgrade, not to finished grade, is what your equipment moves.

In Earthwork Pro, building, paving and landscape areas carry their sections, pads and basements are drawn on the plan, and roads come from a centerline, profile and typical section.

6. Calculate, then check it

Before you price anything, check the result:

  • Look at the cut/fill map. Cut and fill should fall where the plan says the site gets lower and higher.
  • Cut a few sections across the site, especially at pads and the limit of grading.
  • Check the surfaces in 3D for spikes, which are almost always a wrong elevation.
  • Compare the net import or export with what the engineer's notes say, if they say anything.

7. Adjust for the soil and price it

Bank yards are not truck yards. Apply shrink and swell from the geotechnical report, carry strip and topsoil separately, and add over-excavation where the geotech calls for it. Then price cut, fill, import or export, fine grade and the rest.

In Bedrock the quantities go to the job's estimate as line items and are priced with your own cost data. Sending again updates the quantities and keeps your prices.

Try it on your own plan

Earthwork Pro is included in Premier and in the 7-day trial. See how it works, or read how the tools compare.

Questions

Can you do an earthwork takeoff from a PDF?

Yes. A vector civil PDF carries the contours and labels as linework and text. Earthwork Pro reads them, sorts existing from proposed for your review, and builds the surfaces. A scanned PDF has to be traced instead.

How do I tell existing contours from proposed?

Check the plan's legend. Existing contours are usually dashed or screened, proposed contours solid and heavier. Earthwork Pro's Auto identify sorts them for you to check.

Should I calculate cut and fill to finished grade or subgrade?

To subgrade. Pavement sections, slabs and topsoil sit above it, so the dirt your equipment moves stops at the bottom of those sections.

Machine-readable site summary for AI crawlers: /llms.txt