GPS machine control grades to a design surface, not to a PDF. When the engineer's CAD model isn't available, or you're building the data yourself to save time, the path runs from the plan sheet to a surface, from the surface to open files, and from open files to the machine's own format. Here is each step and who does it.
1. Build the surfaces from the plan
The machine needs the finished grade, and usually the subgrade too: the bottom of the pavement sections and building pads is what the dozer cuts to. Both come from the same takeoff that gives you cut and fill: contours and spot grades read off the grading plan, pads and paving areas with their sections, and the limit of grading.
In Bedrock's Earthwork Pro these surfaces are built when you calculate, and the files for the field are made from that stored calculation, never from an approximate preview.
2. Export open formats
Every machine-control brand's office software reads open formats:
- LandXML 1.2 for surfaces (TINs) and alignments or linework.
- DXF for linework, and for surfaces as 3D faces.
- CSV for stake and control points.
- KMZ so anyone can look at the cut/fill and limits in Google Earth.
Earthwork Pro's Send to the field makes one ZIP with these files, laid out in a folder per brand: Trimble (Earthworks, Siteworks and WorksManager), Cat (VisionLink), Topcon (3D-MC, plus Komatsu iMC and Deere SmartGrade), Leica (iCON), Unicontrol and iDig. Each folder says which files that brand takes and how they usually reach the machine.
3. Convert to the native format
Native machine files, such as Trimble's .svd and .ttm or Topcon's .tp3, have no public specification. The brand's own office software (WorksManager or Trimble Business Center, VisionLink, MAGNET, iCON office) or your dealer makes them from the open files. Be wary of any tool that claims to write a native format for every brand.
4. Put it on site control
Plan coordinates are not site coordinates. Your surveyor localizes the design to the site's control points (the calibration file) before a machine uses it. Earthwork Pro passes your surveyor's calibration file through unchanged and can tie a sheet to a real coordinate system, from US State Plane and UTM to Australia's MGA and New Zealand's grids.
5. Check the first load
Before the first pass, check the design on the machine against a few known points on site: a benchmark, a corner of the pad, a curb grade. Do it with your dealer or surveyor on the first job with any new data source.
Takeoff and machine data from one model
Building the machine surfaces from the same model as the bid means the yards you priced are the yards the machines move. See Earthwork Pro, or read how the takeoff tools compare.