Footing takeoff checklist (PDF)

A printable checklist of every footing scope item that gets missed on a typical foundation proposal. Use it before you submit.

Pre-submit footing checklist

Run this list before you submit any foundation bid. The items below are the most common scope misses we see in bid post-mortems.

Quantities

  • Spread footings by type (size × depth)
  • Continuous footings — full LF including corner bars
  • Pier count by diameter and depth
  • Grade beams — LF and dowels into piers
  • Mat slab — SF, thickness, top mat, bottom mat
  • Pile caps — count, size, top mat
  • Thickened slab edges where applicable

Rebar

  • Top mat each way at correct spacing
  • Bottom mat each way at correct spacing
  • Pier vertical bars and ties (or spirals)
  • Dowels from footings to columns/walls
  • Corner bars at every continuous footing change of direction
  • Hooks where required by code
  • Splice laps included in tonnage

Excavation

  • Footing trench excavation
  • Spoil disposal (haul-off vs. on-site)
  • Over-excavation per geotech
  • Select fill if required
  • Compaction and proof roll
  • Dewatering if water table is shallow

Forms

  • Side forms for spread footings
  • Continuous footing forms
  • Pier forms (if formed, not drilled)
  • Stripping and cleaning labor
  • Form release agent

Concrete

  • Mix design per spec
  • Pump truck if access requires
  • Cold weather protection
  • Hot weather curing
  • Cylinder testing coordination

Coordination

  • Anchor bolts and embeds delivered to site by trades
  • Templates for anchor bolt placement
  • Survey for layout
  • Inspection coordination

Print this. Tape it to your monitor. Run it before every submission.