Build a per-job schedule from your estimate in under 10 minutes
Use the new scheduling tab to generate a full Gantt straight from your line items, then refine durations, dependencies, and crew mix.
A Gantt chart for your job, generated from your estimate, with realistic durations based on your crew production rates, the critical path highlighted, and a printable two-week lookahead for the field.
An estimate with line items priced A crew setup attached to each labor-driven assembly (so the scheduler knows how many bodies are on the work) A project start date on the Project Setup tab
In any project, click Schedule in the side rail. If the project has no schedule yet you'll see a single button: Generate from Estimate.
Bedrock walks every line item, looks at the quantity, the assigned crew, and the production rate, and computes a duration. Each line item becomes a task. The tasks are ordered by CSI division and sequenced based on construction logic (sitework before footings, footings before walls, walls before slabs, etc.).