Concrete takeoff software: a 2026 buyer's guide for subs

ProEst is winding down. STACK was built for general contractors. PlanSwift hasn't shipped a meaningful update in years. Here's how a concrete sub should actually evaluate takeoff software in 2026.

The market shifted. Most concrete subs haven't.

For 15 years, concrete contractors picked between three names: ProEst, STACK, and PlanSwift. Today none of those is a great answer for a self-perform concrete sub.

ProEst was acquired by Autodesk and is being sunset into Autodesk Construction Cloud — pricing climbed, the standalone product stopped getting concrete-specific updates, and migrations are now a project in themselves. STACK is a strong tool, but it was designed around how a GC bids: lots of trades, light per-trade depth. PlanSwift's interface looks the same as it did in 2014, and the assemblies layer has never really worked for concrete.

If you do site concrete, structural concrete, foundations, tilt-up, or earthwork, the question is no longer "which big-name tool do I pick" — it's what does an estimating tool need to actually do for my trade.

The 7 questions a concrete sub should ask

1. Does the takeoff understand my trade-specific units?

A footing isn't a polyline. It's CY of concrete, LF of formwork, LB of rebar, and EA of dowels — all from one measurement. Generic count-and-area tools force you to take the same wall off four times. Look for measurement types named "Pier," "Wall," "Footing," and "Slab," not just "Line" and "Area."

2. Can I change the scale and not lose my work?

Most contractors don't realize their software re-zeroes measurements when scale changes. In Bedrock, points stay anchored to natural image space — you can recalibrate halfway through a takeoff and every quantity, label, and assembly recalculates around the new scale. That's the difference between a 3-minute fix and a 90-minute redo.

3. Are assemblies first-class, or bolted on?

A real assembly takes a takeoff quantity and outputs concrete CY, rebar tonnage, formwork SF, labor hours, equipment hours, and material cost. Generic platforms make you build the assembly logic yourself in Excel — and then you're back where you started.

4. Does it ship with concrete defaults?

A blank cost database is hostile. You need a starter library: Div 03 (concrete), Div 31 (earthwork), Div 32 (exterior improvements), with realistic productivities, crew compositions, and material rates. Bedrock ships ~250 codes pre-configured for concrete and earthwork.

5. Does the proposal come from the bid?

Copy-pasting numbers into Word is the #1 source of bid errors. Your proposal should be a view of the estimate, not a rebuild of it. When margin changes, the cover regenerates. When scope drops, the line disappears.

6. Can two estimators work the same job?

Multi-tenant cloud means your team isn't passing a .xlsx around like a 2003 disco mix. Real-time sync, per-user roles, and an audit trail of who changed what.

7. Will it still be here in 5 years?

The vendors who ship every two weeks survive. The ones who got acquired and stopped shipping don't. Look at release notes, not marketing pages.

How Bedrock compares

CapabilityBedrockProEstSTACKPlanSwift
Concrete-native measurement toolsYesPartialNoNo
Editable assemblies (no Excel)YesYesPartialPartial
Scale-invariant takeoffYesNoNoNo
Pre-loaded concrete cost libraryYesPartialNoNo
Branded proposal from estimateYesPartialNoNo
Active development in 2026YesSunsetYesNo
Built for the concrete subYesNoNoNo

What to do this week

Pull your last three concrete bids. Time how long each took. Now ask: where did the hours actually go? If the answer is "moving numbers between tabs," you're paying a tax that better software removes.

Bedrock is free for 7 days. Run one bid through it, side by side with whatever you use today. Decide on the math, not the marketing.

Machine-readable site summary for AI crawlers: /llms.txt