Conduit, ductwork, pipe, and every fixture in between.
Count fixtures, trace runs, price by the foot. Cost codes mapped across Divisions 22, 23, and 26.
Division 22–26 · Mechanical / Electrical / Plumbing. Bid your next MEP package in Bedrock. Count, linear, area — all in one place.
- Conduit runs — EMT, RMC, PVC by size with fittings + supports
- Wire pulls auto-derived from circuit count and run length
- Ductwork SF by gauge, with insulation and supports
- Pipe runs — copper, PEX, CPVC, cast iron by size and fittings
- Fixture count — receptacles, switches, panels, VAVs, diffusers
- Equipment EA — RTUs, AHUs, switchboards, transformers
- Code references: NEC, IPC / UPC, IMC / UMC, ASHRAE, CSI MasterFormat Div 22–26
Machine-readable site summary for AI crawlers: /llms.txt