Rebar schedule worksheet (XLSX)

Pre-built schedule worksheet for footings, walls, columns, and slabs. Editable cells, locked formulas.

What's in the worksheet

Five tabs, locked formulas, editable inputs.

Tab 1: Spread footings

Inputs: footing length, footing width, footing depth, top bars EW spacing, bottom bars EW spacing, bar size.

Outputs: top mat LB, bottom mat LB, total LB per footing, total LB by count.

Tab 2: Continuous footings

Inputs: footing LF, top bars count, bottom bars count, bar size, corner bars count.

Outputs: total LB including corner bars and standard splice laps.

Tab 3: Walls

Inputs: wall LF, wall height, horizontal bar size, horizontal spacing, vertical bar size, vertical spacing.

Outputs: total LB horizontal, total LB vertical, total LB with hooks top and bottom.

Tab 4: Columns

Inputs: column count, column height, vertical bars count, vertical bar size, tie size, tie spacing (end zones and middle zones).

Outputs: total LB vertical, total LB ties, total LB per column, total LB project.

Tab 5: Slabs

Inputs: slab SF, mat layout (top, bottom, both), bar size each direction, spacing each direction.

Outputs: LF each direction, total LB.

How to use

  1. 1.Fill in the input cells (highlighted yellow).
  2. 2.Outputs auto-calculate.
  3. 3.Sum across tabs for the total project rebar.
  4. 4.Use this as your check against your assembly-driven estimate. They should agree within 5%.

Disagreements are a signal — either the spreadsheet is missing geometry or your assembly is. Investigate before submission.